What is the best project management software for medium-sized businesses? There are plenty of solutions available but not all of them are ideal for medium-sized organizations. With more people to manage and more complex projects to tackle, the need for effective collaboration and communication becomes highly critical in such cases. Clarizen tops our list for its ability to scale to more enterprise functions, while Wrike and monday.com are close behind; our extensive tests showed that both are agile enough for small and complex projects.
In this article, we narrowed down the list of all available solutions to 20 best products you can explore for your project management needs.

What are the 20 best project management solutions for mid-sized businesses?
Medium-sized businesses have more employees compared to small businesses. That means project workflows are more complex and coordination becomes more challenging. Often, the reason is the lack of clear objectives and prioritization on core project functions in project management. In fact, a research conducted by PMI shows delivering a project without a clear and aligned goal leads to 37% of project failures. Hence, it’s not surprising to know that poor project performance wastes up to $122 million for every $1 billion invested in the US.

Challenges in project management. (Source: IPVM)
According to a report by IPVM, among the top problems for project management are team miscommunication (16%) and missed deadline (11%). This is even more apparent in medium-sized organizations. The larger number of employees compared to small businesses demands the adoption of a more streamlined process. Having a project manager and project management tool becomes crucial in staying on top of your workflows and deadlines. We took these issues into consideration to come up with the list of project management solutions fit for the mid-sized organization.
You’ll find the solutions below to be capable of avoiding conflicts in your internal and external projects. All of them also offer clear visibility and centralized information to leverage your processes. Clarizen, as an example, is an excellent solution to consider. It has in-context collaboration, automation, and configurable workflows to empower how your business scales and deliver projects with agility.
Moreover, new technology and customer demands are driving a change in project management solutions according to Inc.com. For instance, the emergence of Big Data opens more variables and controls to monitor. There are also innovations in data visualization, machine learning, digital assistants, and individual accessibility. Mid-sized businesses can utilize these features in delivering small and large projects successfully. Looking at project management rankings like the one below can help you speed up the purchase journey get into your project right away.
Before exploring project management solutions, it is crucial to understand first what a project management software is. You may read this comprehensive guide prepared by our team of experts — What is Project Management Software? — to get a better understanding of this software’s types, features, trends, and function. Once you’re ready, you can proceed with exploring the best project management software for medium-sized businesses.
Top 20 Project Management Software Systems for Medium-Sized Businesses
1. Clarizen

First on our list of best project management software for medium-sized businesses is Clarizen. It is a web-based project management solution that specializes in accelerating the processes of your project through streamlined collaboration. It is suitable for teams looking for a robust solution to help them save time and leverage cross-company engagement. It helps you make sure the right member and team are working on the right project by tracking, engaging, and communicating effectively.
The tool offers solutions for project managers, professional services, IT, and marketing teams. Some of the main Clarizen features include automated demand management, project and portfolio optimization, resource management, expense and timesheets, project financial management, and reporting and dashboarding, among many others.
Mid-sized businesses can choose between two plans according to their needs: Enterprise and Unlimited Editions. Both are packed with features that vary in Full, Team Member and Requestor license types to support the specific workflow requirements of each member of your organization. The main difference between the two plan editions is based on tiers on file storage, business rules, and scheduled components, among others. If you want to explore the product first, you can sign up for Clarizen free trial to use its features for 30 days.
Top 3 Reasons to Use Clarizen:
- Clarizen Bot. This feature connects your workflows and project data from Clarizen to team chat platforms such as Slack and Microsoft Teams. This simplifies communication and task prioritization.
- Robust app marketplace. It is built to integrate and extend Clarizen’s functionality with a rich set of apps and solutions such as Slack, Salesforce, and Jira, among many others.
- Automate demand management. Focusing on accelerating processes, it automates admin tasks, project and idea creation, and initiative planning so you can focus on more important tasks.
2. Wrike

Wrike is a popular project management platform that is easy-to-use. At the same time, it effectively helps you deliver operational excellence. Its dashboard shows your goals and priorities in a quick glance to easily organize your processes. Templates, Gantt Charts, and Resource Allocation are interactive to streamline utilization of resources. This helps distributed teams to collaborate effectively and productively with the flexibility to tailor workflows and project folder structures according to your needs.
Wrike pricing options for mid-sized companies start at its Business plan which supports up to 200 users. It costs $24.80/user/month with volume discounts. If you have more users, Wrike has an Enterprise plan that caters to unlimited users and more advanced security and control features. Pricing information is tailored to your needs, hence, you need to request a quote.
Meanwhile, you can use the platform at no cost when you sign up for Wrike free trial here.
Top 3 Reasons to Use Wrike:
- Scalable and flexible. It is used by project management, creative, marketing, professional services, business operations and product development teams of any size.
- Easy integration. It integrates easily with third-party systems such as Salesforce, Google, GitHub, Jira, and Adobe Creative Cloud.
- Customizable dashboard and reports. Include real-time updates, graphs, and tasks on dashboards and reports for a quick informative view.
3. monday.com

monday.com is a team management solution that offers a collaborative space for planning, organizing and tracking your projects. Workflows are easily customizable to fit the different needs of your teams. It also offers various solutions for visualizing your projects and your project’s performance in a calendar view, chart view, files view, Kanban view, map view, and timeline view. Starting out your projects is streamlined with templates. You can also stay connected with its mobile app. To learn more, you can check our detailed monday.com reviews.
monday.com’s plans are priced according to the number of users and feature set. Starting from the Basic plan, it costs $49/month (Basic) for 5 users up to $1,999/month (Pro) for 100 users. For more than 200 users and Enterprise plan, you can contact the vendor to request a custom pricing for its four plans: Basic, Standard, Pro, and Enterprise. You can also sign up for monday.com free trial here to explore the software and decide which features you need.
Top 3 Reasons to Use monday.com:
- Visualization. It helps businesses organize work by visualizing tasks and projects.
- Big picture. It shows different views to see your project’s big picture based on timeline, map, files, calendar, Kanban, and charts.
- Templates. It has numerous templates to accelerate your project creation for agile management, production tracking, client management, project tracker, department plan, and event planning, among others.
4. Smartsheet

Smartsheet is a collaboration tool to streamline your project management. It helps you in planning, capturing, managing, and automating processes to support you throughout the entire project lifecycle from idea to impact. Its interface is simple and intuitive for users to speed up execution by quickly configuring, adapting and fine-tuning it for their workflows. Some of the main Smartsheet features also include dashboards, forms, portals, alerts and automated workflows, resource management, and reports, among others.
Businesses can start with Smartsheet’s Business plan which costs $25/user/month. This offers automation, reporting, user and system administration, and more add-ons and integrations. Additionally, it has advanced admin controls and security with its enterprise-specific plan and premium option that are offered in custom pricing.
You can sign up for Smartsheet free trial here to check out the software’s features.
Top 3 Reasons to Use Smartsheet:
- Enterprise-approved security. It has secure permission controls and intuitive control access to manage and scale projects with confidence
- Admin visibility and control. It can utilize admin controls with compliance and governance frameworks for data and user management.
- Integrated software. It offers built-in connected experiences, deep integrations with API and connectors with enterprise applications such as Salesforce, Office 365, and Jira, among others.
5. ProjectManager

ProjectManager offers a complete project management platform for planning, tracking and reporting on projects. This online software can be accessed using any device so you can work on your Mac and Windows desktop or on your Android or iOS smartphone and tablet on-the-go. Its main features include planning and scheduling, task management, collaboration, team management, time tracking, and real-time dashboards.
ProjectManager pricing plans for mid-sized organizations are Team and Business at $20/user/month and $25/user/month, respectively. The Team plan is built for growing businesses. For mid-sized businesses, the Business plan is more ideal due to its unlimited features. File storage, projects and multi-project tools such as timesheets, expenses, advanced reports, workload management, and custom security are also exclusive to the Business plan.
Top 3 Reasons to Use ProjectManager:
- Auto-fill timesheets. Timesheets are automatically filled based on the previous week’s tasks with project management and time-tracking tools.
- Extensive integrations. It lets you integrate with over 400 applications such as Salesforce, Dropbox, Slack, Google Apps, and Office 365.
- Easy-to-generate reports. Reports are available on a single click and easily shareable online across your team.
6. ReQtest

ReQtest is a cloud-based platform that offers project management solutions for bug tracking, requirements management, and test management. This tool is suitable for software development or implementation. It has an agile board that streamlines your task collaboration, communication, and coordination. Managing your requirements from end-to-end is streamlined and bugs are automatically detected and fixed. You can learn more about this software in this ReQtest overview.
ReQtest is priced at a pay-as-you-go basis. This means you will only pay for the software when you’re using it; there is no long-term commitment. Mid-sized teams can use its Professional plan. It supports unlimited users which costs $45/user/month. The licensing options are flexible and volume discounts are available. For instance, it costs $12/user/month for 51 to 100 users, while for 101 to 1,000 users pricing is discounted to $6/user/month.
Top 3 Reasons to Use ReQtest:
- Advanced bug tracking. It simplifies identifying, tracking, and capturing issues and bugs with built-in filters.
- Tailor-made test management. The module is carefully integrated to execute and plan tests effectively while gaining actionable insights from the reports.
- Holistic project view. It helps you keep track of your project’s progress using agile boards to visualize tasks.
7. Zoho Projects

Zoho Projects is a popular easy-to-use project management platform. It simplifies complex projects by breaking them down into smaller, manageable and actionable tasks, task lists, and milestones. It ensures collaboration among your employees, clients, consultants, and vendors via cloud. Among the Zoho Projects features, document management, issue tracking, and fixing, time tracking and comprehensive Gantt charts are the most cited positively by users.
Zoho Project offers three plans ideal for medium-sized businesses: Express, Premium, and Enterprise. They cost $40/month, $85/month, and $125/month, respectively, when billed annually. These plans already include 25 users. If you want to add more beyond the 25, it costs $2/user/month for Express, $3/user/month for Premium and $4/user/month for Enterprise. They all feature unlimited projects while project templates, file attachment storage, and advanced features are tiered.
You can use the software for 10 days for free when you sign up for Zoho Projects free trial here.
Top 3 Reasons to Use Zoho Projects:
- Social project management. It uses social elements such as feeds, forms, pages and chats to manage work and leverage collaboration.
- Time tracking. Timesheets, invoices, planned hours and calendar lets you keep your schedule and coordinate work accurately.
- Issue tracking. It simplifies logging, tracking, and solving issues with business rules, SLAs, and real-time notifications.
8. Hive

Hive, a productivity platform, specializes in enabling your members to manage their workflow based on their preferred view. It makes switching between different views – Gantt, Kanban, table and calendar – easily and quickly. Its productivity features include files, forms, messaging, resourcing, and analytics. Additionally, it is working on new features such as email sync with Gmail and Outlook, meeting notes, and proofing and approvals to leverage your processes. You can read our comprehensive Hive review to understand the software better.
You can start with Hive’s Professional plan for $12/user/month. This already includes unlimited storage, projects, and messages with data export, Hive API and project management toolkit. If you need enterprise-grade features and an on-premise installation, you can opt for its Enterprise plan with tailored pricing.
Hive lets you use the software at no cost for 14 days when you sign up for Hive free trial here.
Top 3 Reasons to Use Hive:
- Integration. It boasts integrations with over a thousand applications through Zapier.
- Action templates. Layout steps for planning tasks and reusing them for future projects that can be configured to new timelines and people.
- Predictive notifications. It uses machine learning to alert you with any issues that may lead to delays and bottlenecks.
9. Zoho Sprints

Another project management tool from Zoho that made it to the list is Zoho Sprints. This Zoho Sprints overview shows that it focuses on agile project management to quickly adapt to changes and ensure on-time project delivery. iOS and Android apps help you stay connected anytime, anywhere along with features such as agile report insights and Scrum boards. Prioritizing tasks and recreating them is accelerated with the software’s intuitive planning center. It also has dashboards, time tracking, reports, meetings, feeds, and visualizations.
Zoho Sprints’ Premium plan is suitable for medium-sized businesses. It only costs $29.2/month with 10 users already included. Of course, this is scalable as you can add more users for $2.5/month each. This already includes all the features of the software. Meanwhile, if you have more than 500 users, you have to request a custom quote from the vendor.
You can sign up for Zoho Sprints free trial here to get a hands-on experience of the software’s premium plans.
Top 3 Reasons to Use Zoho Sprints:
- Planning center. Its planning center is flexible for building new sprints and backlogs thanks to its intuitive drag-and-drop interface.
- Transparent timesheets. One-click approvals and logging of billable and non-billable hours are streamlined.
- Meetings module. Daily reminders are automated and scheduling sprint reviews are done with ease.
10. VivifyScrum

VivifyScrum is an agile project management system that empowers collaboration, team management, and invoicing. It covers all stages of your business processes in a single application. Keeping track of your team’s workload is also optimized, where you can gather insight into their availability and tasks. You can leverage the software’s built-in time-tracking feature where you get automatic work logs and time spent on tasks. The array of VivifyScrum features includes collaboration boards, stats and reports, organizations, projects, and integrations, among others.
Since it is highly scalable, teams of mid-sized businesses can use the software with ease. At only $8/user/month with no user limit, you can get unlimited items, item history, files storage, external integrations, and access to all of its feature set.
Top 3 Reasons to Use VivifyScrum:
- Collaboration board. Use a Scrum board or Kanban board according to your needs and preference for your workflows and collaboration.
- Invoicing. You can create invoices, send them to clients, and track payments all in a single platform.
- Time management. Its time tracking tool leverages your work logs and invoice generation and reports.
11. ProWorkflow

ProWorkflow is another tool that automates staff assignment, time tracking, and project scheduling. Users can quickly see an overview of their priorities, workflows, and time spent on projects. You can also manage workflows in organized views and groupings. It simplifies quoting and invoicing through an optional plugin. Additionally, it has features for data security, file sharing, alerts and notifications, templates, timelines, and dashboards.
ProWorkflow pricing is on a per-staff user basis which enables you to scale easily. Projects and tasks are included for free with no limits. You can also give contractors and clients access at no additional expense. Opt for its Professional plan at $20/user/month. If you need more storage space, upgrade to its advanced plan for $30/user/month.
Top 3 Reasons to Use ProWorkflow:
- Free access. Your clients and contractors can access the software at no cost.
- Security and backups. It backups your data every day and protects them with 128-bit encryption.
- Simple integrations. Through Zapier it enables you to connect with a variety of file storage and accounting systems.
12. Task2Bill

Task2Bill is an online project management solution that consolidates your projects, resources, and invoicing. This reduces the number of systems you need to use. It utilizes the software’s functionalities by converting tasks into invoices, where applicable. Teams and clients can collaborate on projects for a complete centralized solution. Its key features include task management, time tracking, milestones, billing, and unified communication. You can also check out these Task2Bill pros and cons to determine whether it suits your workflows.
Task2Bill is priced according to the number of users. The Starter plan costs $15/month for 50 users and 10 projects. The Pro and Advanced plans both offer unlimited quotation and invoicing which are priced at $25/month (100 users) and $50/month (200 users), respectively. You can also request to tailor a plan according to your needs by contacting the vendor.
Top 3 Reasons to Use Task2Bill:
- Billing. It offers quotations, invoices, payments, billable items, and client chart rate and negotiation to simplify calculations.
- Clients and contacts. It lets your clients and contacts to collaborate on your projects in addition to your admins, managers and working employees.
- Project management. Keeping track of tasks is simplified based on priority, comments, and status. You can also use Kanban charts, milestones and tracked time.
13. Asana

Asana is a work management platform that lets you structure your work in a way that focuses on your goals. Organizing tasks is done by sharing task details, assigning them to the right team members, and setting priorities and deadlines, accordingly. Since it integrates with popular third-party systems, you can easily consolidate data from emails, tickets, and calendars to eliminate manual data entry.
Asana’s plans are scalable. Premium and Business plans are available at $9.99/user/month and $19.99/user/month, respectively. The Business plan is ideal for mid-sized businesses that work across initiatives in teams and companies. An Enterprise plan is also available at custom pricing for advanced security and control such as SAML, custom branding, and user provisioning and de-provisioning. Check our in-depth Asana review for more information about the product.
Top 3 Reasons to Use Asana:
- Visual project plans. This helps you visualize project plans to see the bigger picture and ensure deadlines are met.
- Calendar. You can see your schedules and tasks with a single glance to stay on top of deadlines.
- Portfolio. This shows you a real-time progress of your projects.
14. Jira

Jira is built for agile teams to track projects and issues. Software teams can easily plan sprints, build user stories and share them across the team. It provides a single glance of the project for easier communication and prioritization. Additionally, it can easily be integrated with developer tools such as Confluence, Bitbucket, and Bamboo and other apps in its marketplace like Zephyr and Tempo Timesheets.
One of the main Jira benefits is flexibility. It can be used by teams of any size. For up to 100 users, it costs $7/user/month. Larger teams with more than 100 users can request discounts. Moreover, a plan for self-hosted deployment is available. Server, for a single-server deployment, is priced for a one-time payment starting at $4,500 for 50 users. Data server costs from $12,000/year for 500 users.
Top 3 Reasons to Use Jira:
- Deployment options. You have options to choose between in the cloud or self-hosted deployment.
- Boards. Scrum and Kanban boards give you flexibility on how to visualize your tasks and workflows.
- Roadmaps. This feature is built right into the software to visualize the big picture and it makes sure the roadmap aligns with your team’s work.
15. Trello

Trello is a Kanban-based collaboration tool for agile projects. Trello cards let you add details, comments, images, links, checklists, and deadlines for end-to-end collaboration. Its mobile app is robust and intuitive to Android and iOS devices. It syncs your data seamlessly in real-time so you stay connected with the latest updates. It also has Power-Ups to extend the software’s functionalities by integrating with other systems.
Mid-sized companies that manage multiple teams and want more security can use the Trello’s Enterprise plan. It costs $20.83/user/month. It has SSO, two-factor authentication, file encryption at rest and custom security review, among others. Meanwhile, its lower plan, which costs $9.99/user/month, is also robust with unlimited Power-Ups and Collections for board organization. To know more about this product, you can check this detailed Trello review.
Top 3 Reasons to Use Trello:
- Simplicity. It is simple and easy to use with its highly visual Kanban board style.
- Unlimited users. You can invite as many people as you need for free by simply sending an email.
- Calendar Power-up. Stay on top of tasks, upcoming events, and deadlines through a seamless calendar integration.
16. Taskworld

Taskworld focuses on visualization to streamline the tracking of tasks. Visual boards let you monitor and assign work to the right member with ease. Files can easily be attached to the right project and task. Each project is logged with the time spent on each task. It also supports communication through real-time messaging. It has workspaces, task lists, checklists, activity logs, and multiple assignees to stay on top of your projects.
Taskworld’s major features are packed in its Professional plan that costs $10.99/user/month. This comes with 100GB storage and unlimited tasks, projects, and guests. If you need an on-premise tool or dedicated server, you can contact the vendor for its price. This unlocks additional Taskworld features such as SAML 2.0 SSO, unlimited cloud storage, unlimited workspaces, and daily full and continuous data backups.
Top 3 Reasons to Use Taskworld:
- Enterprise-grade solution. Suitable for users who are looking for a dedicated server and on-premise option.
- Project planning. It has tools for project groups and templates, timeline, calendar, and privacy settings to monitor projects efficiently.
- Robust analytics. Generate insights from burndown and burnup charts, performance reviews, and advanced filters.
17. Microsoft Project

Microsoft Project is a popular project management solution and a legacy in the field. It is used by many companies to monitor and deliver projects successfully. It accelerates project creation using the built-in teams tool so you only have to customize them according to your needs. You can also simplify the project planning stage with prepopulated pulldown menus and Gantt charts. Additionally, the software supports resource management and portfolio management.
The complete project and portfolio management solution of Microsoft Project can be accessed on its Project Online Premium plan. This costs $55/user/month with all the features of the cloud-based software. An on-premise solution is available at $589.99 for Project Standard and $1,159.99 for Project Professional. It also has a complete on-premise tool with custom-based pricing. To determine if it matches your requirements, check out the Microsoft Project pros and cons.
Top 3 Reasons to Use Microsoft Project:
- Portfolio management. It is used for prioritizing initiatives and business objectives with data-driven insights.
- Resource management. It shows you how your resources are utilized with executive oversight.
- Out-of-the-box report. Financials and burndown chart reports, among others, are easily generated and shared across your organization.
18. Meistertask

Rounding up our list of 20 best project management software for medium-sized businesses is Meistertask. This tool is highly intuitive and easily adaptable to any of your workflows. You can add as many team members as needed to a project with complete visibility on who is assigned to what. This ensures your teams are aligned and up-to-date with the project’s progress.
For your business, you can start with a range of Meistertask pricing options tiered in Pro and Business plans. They are priced at $8.25/user/month and $20.75/user/month, respectively. These plans support robust workflow automation, integrations, group sharing, and security permissions. The Business plan unlocks more features such as roles and permissions, guest access for projects, and unlimited attachment size. Meanwhile, you can also request for a custom pricing quote tailored to your specific individual needs.
The vendor offers a great free trial plan that lets you try out all the key features first.
Top 3 Reasons to Use MeisterTask:
- MindMeister integration. It empowers you to build project plans and brainstorm in real-time using the online mind mapping application.
- Flexible and open tool. It can be readily integrated with popular tools like Box, Zendesk, Dropbox, Github, and Bitbucket, among others, to help you save time and automate workflows.
- Customizable dashboard. It allows dashboards to be customized according to your needs like priority tasks, updates, and open task overview.
19. Workamajig Platinum

Workamajig Platinum is a project management tool suitable for marketing teams such as in-house creative teams and advertising agencies. It enables collaboration on a single platform and provides complete visibility for your staff and managers. Its automated data entry also ensures accuracy. The features vary based on your organization. For example, agency management and reporting tools are built-in for agencies. Meanwhile, project intake and management functionalities are included for in-house creative teams.
The price range for both editions is the same. Mid-sized organizations for both agency and in-house teams are offered in a Mid-Sized plan that costs $34/user/month for those with 50 users. If you have 100 users and above, you can opt for its higher plan that costs $32/user/month. The price is lower if you have more users. For more than 200 users, you can contact the vendor for a custom pricing.
Top 3 Reasons to Use Workamajig Platinum:
- Creative agency management. It provides you with relevant insights for your team such as client profitability reports and CEO/CFO revenue forecasting.
- In-house team project management. It specializes in managing project requests, utilizing resources and task assignment to creatives.
- On-site training. It offers on-site training in addition to browser-based training at an additional expense for setting up the system that’s tailored to your needs.
20. Podio

Podio is a customizable work management platform that syncs your team’s collaboration activities and conversations. Its top features include granular access, automated workflows, data visualization, social collaboration, calendar, and integrated chat. It is designed to leverage peer-recognition and sharing for engaging your employees and driving productivity. Empowering the software can also be done with ease by connecting it with apps such as Zendesk, Dropbox, Freshbooks, and Google Calendar.
The highest plan offered by Podio is called Premium at $24/user/month. It offers a full collection of advanced features such as contact sync, interactive dashboards, and visual reports. You may check our Podio review to learn more about its features and benefits.
Top 3 Reasons to Use Podio:
- File sharing. The integrated solution streamlines file sharing for all tasks you’re working on.
- Collaboration. You can attach files, write comments, and view statuses on Podio items.
- Project views. You have control over how you want to view your projects and tasks such as in dynamic cards, boards or tables.
If you want to explore more options, you may check out this list of top 20 online project management tools to manage your projects. It compiles robust products that bring value to your business in terms of factors such as facilitated onboarding, affordability, access to information, and collaboration.